Current news

29.10.2009 standard

29.10.2009 standard

29.10.2009 akumulace 8

29.10.2009 standard

23.10.2009 Simulation of a collision on a level crossing

SŽDC, s. o. in cooperation with ČD a. s. assisted the production team of a prevention-based programme STOP! and created conditions for shooting a realistic collision of a passenger car with a train, which was carried out here for the first time.

19.10.2009 GSM-R seminar

A specialized seminar on the digitizing of national railway corridors was the final point prior to the festive completion of the project entitled GSM-R, Completion of the Ist National Railway Corridor. The railway corridor from the state border near Děčín via Prague and Brno as far as Břeclav and to the Austrian and Slovak border has been fully covered with the European digital radio-communication system GSM-R

13.10.2009 Optimization of the section Beroun - Zbiroh underway

The main benefit of the ongoing construction in the railway section between Beroun and Zbiroh will represent a higher line speed and a more comfortable access to trains. The total length of the reconstructed section is 23 647 m, of which the line relocations cover 7 510 m. A part of the construction is also a 324m-long tunnel section.

12.10.2009 obyvatelstvo

12.10.2009 podnikatele

12.10.2009 Ceníky

Reception
Phone:+420 222 335 711
(during working hours Mo-Fr)

  Mail us
More contacts

epodatelna@szdc.cz Copyrigtht © 2009 SŽDC, s.o.