Reconstruction of the railway station Bojkovice including the reconstruction of signaling equipment

Project number: CZ.1.01/3.1.00/09.0149
Project location: Zlínský kraj
The exact place of realization: Bojkovice
Corridor: none
Project start date: 15. December 2009
Project completion date: 31. March 2011
EU financial resources: Cohesion fund
Approved Project total cost: 292 734 000 Kč
Approved EU contribution: 188 809 650 Kč
Final beneficiary: Správa železniční dopravní cesty, státní organizace (SŽDC)
National co-financing authority: Státní fond dopravní infrastruktury (SFDI)
Construction supervision: SŽDC s.o., Stavební správa Olomouc
Contractor: "Sdružení SBT+SIGNALBAU-žst. Bojkovice" složené z firem Subterra a.s. (vedoucí sdružení), SIGNALBAU a.s.(účastník sdružení)
Detailed design contractor, author´s supervision: MORAVIA CONSULT Olomouc a.s.
Date of project financing decision: 23. March 2010
Project approved by: ŘO OP Transport
Project approved within the priority axis: 3 - Upgrading Railway Networks outside of the TEN-T Network
Intervention area: 3.1 - Upgrading and Development of the Railway Network outside of TEN-T