Reconstruction of the Bylnice railway station,1st Construction

Project number: CZ.1.01/3.1.00/12.0257
Project location: Zlín Region
The exact place of realization: Brumov-Bylnice
Project start date: 1. January 2012
Project completion date: 30. April 2013
EU financial resources: Cohesion fund
Approved Project total cost: 240 477 094 Kč
Approved EU contribution: 151 576 833 Kč
Final beneficiary: Railway Infrastructure Administration, state organisation (RIA)
National co-financing authority: State Fund of Transport Infrastructure (SFTI)
Construction supervision: SŽDC Stavební správa východ
Contractor: "Sdružení Vlára 2012" - Signalbau a.s a Tomi-Remont a.s.
Detailed design contractor, author´s supervision: MORAVIA CONSULT Olomouc a.s.
Preparatory documentation contractor: MORAVIA CONSULT Olomouc a.s.
Date of project financing decision: 5. April 2012
Project approved by: ŘO OP Transport
Project approved within the priority axis: 3 - Upgrading Railway Networks outside of the TEN-T Network
Intervention area: 3.1 - Upgrading and Development of the Railway Network outside of TEN-T