Reconstruction of railway track and switches at the Česká Kubice stop

Project number: CZ.1.01/1.1.00/08.0028
Project location: Plzeň Region
The exact place of realization: Česká Kubice
Project start date: 1. April 2008
Project completion date: 30. November 2009
EU financial resources: Cohesion fund
Approved Project total cost: 225 603 510 Kč
Approved EU contribution: 155 055 156 Kč
Final beneficiary: Railway Infrastructure Administration, state organisation (RIA)
National co-financing authority: State Fund of Transport Infrastructure (SFTI)
Construction supervision: Ing. Kornel Tesař, SŽDC,s.o., Stavební správa Plzeň
Contractor: Sdružení Česká Kubice, účastníci sdružení: Edikt a.s (vedoucí účastník sdružení), AŽD Praha s.r.o., Stavby silnic a železnic, a.s.
Detailed design contractor, author´s supervision: H-PRO spol. s r.o., autorský dozor Ing. Miroslav Novák
Date of project financing decision: 19. February 2008
Project approved by: ŘO OP Transport
Project approved within the priority axis: 1 - Upgrading the TEN-T Railway Network
Intervention area: 1.1 - Upgrading and Development of Railway Lines in the TEN-T Network including Railway Junctions