<?xml version="1.0" encoding="utf-8"?>
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    <rss version="2.0">
 <channel>
  <title>SŽDC</title>
  <link>http://www.szdc.cz/</link>
  <description>Nejnovější články z www.szdc.cz</description>
  <language>en</language>
  <generator>CMS Aladin</generator>
  <docs>http://backend.userland.com/rss</docs>
			   <item>
			   <title>Reconstruction of the Railway Junction Břeclav coming to an end</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/breclav-se-blizi.html</link> 
			   <description>Despite the restrictions on funds for the reconstruction of the transport infrastructure of the Czech Republic, the Railway Infrastructure Administration, state organization manages to prepare new projects for the implementation of important constructions thanks to reduced expenses. This fact is supported by the completed project for the „Reconstruction of the railway junction Břeclav, 2nd construction“. The railway station Břeclav is one of the most important railway junctions of international significance connecting the Czech Republic with Austria and Slovakia.</description> 
			   <pubDate>Wed, 25 January 2012 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive Completion of the Optimization of the Line Stříbro – Planá u Mariánských Lázní</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/ukonceni-stribro-plana.html</link> 
			   <description>The completed construction mainly contributes to enhanced line speed of up to 140 km/h from the original 60-90 km/h and to enhanced rail operation safety. The optimization focused on a 32km-long single-track section, including seven railway stations (Stříbro, Milíkov, Svojšín, Ošelín, Pavlovice, Brod nad Tichou and Planá u Mariánských Lázní). The section is part of III Railway Transit Corridor. The construction is situated in a most complex and inaccessible territory. The investor of the construction is the Railway Infrastructure Administration, state organization and a significant share - ca 73 % is co-funded by the European Union from the Cohesion Fund.
</description> 
			   <pubDate>Thu, 12 January 2012 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>The Railway Infrastructure Administration as a partner of  an important photography competition promoting the safety at level crossings</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/szdc-partner-fotosouteze.html</link> 
			   <description>The foundation BESIP with the support of the Ministry of the Interior, the Ministry of Transport, the Ministry of Education, Youth and Sports as well as in cooperation with the Railway Infrastructure Administration, state organization, announces a photography competition promoting the traffic operations safety and the safety at level crossings.</description> 
			   <pubDate>Mon, 09 January 2012 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line Votice – Benešov u Prahy: Work progress (January 2012)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-voben-01-12.html</link> 
			   <description>In the past period, work focused on the dismantling of the abandoned line between Votice and Olbramovice and on a reconstructed even set of tracks in Olbramovice, including the dismantling of the current bridge structures – the abandoned railway bridge over Road I/18 and the completely rebuilt extended railway bridge over Road III/11447 from Olbramovice to Božkovice.</description> 
			   <pubDate>Wed, 04 January 2012 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>2011: The lowest number of accidents at level crossings since 2004!</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/prejezdy-2004-2011.html</link> 
			   <description>In connection with the released statistics of the Rail Safety Inspection of the Czech Republic concerning the number of accidents at level crossings, the Railway Infrastructure Administration – state organization – as the operator of the state-owned rail also presents a press release with complementary data on the level crossings for the respective period.</description> 
			   <pubDate>Wed, 04 January 2012 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Project „Implementation of TSI-TAF into SŽDC´s information systems“ commenced</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/implementace-tsi-taf.html</link> 
			   <description>The Railway Infrastructure Administration, state organization launched the project „Implementation of TSI-TAF into SŽDC´s information systems“. The project implementation contributes to enhanced competitiveness of the railway freight transport, better reputation of the railway freight transport in the Czech Republic and to stronger competition towards the road transport. The nature of the project consists in the upgrade and the innovation of SŽDC´s information systems and their communication interconnection, in setting-up the data interaction and transmission in such a way that their subsequent operation can comply with the requirements defined by TSI-TAF (telematic applications in the freight transport). </description> 
			   <pubDate>Mon, 19 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive launch of the „Reconstruction of track No.1,  km 30,650–38,616 of the line Brno – Havlíčkův Brod“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/brno-havl.brod.html</link> 
			   <description>The objective of the festively launched construction is to restore the required structural-technical condition of the permanent way, among others the reconstruction of two bridges on km 34,341 and 35,529. The current permanent way dates from 1976. The investor of the construction is the Railway Infrastructure Administration, state organization (SŽDC).</description> 
			   <pubDate>Thu, 15 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive launch of the „Reconstruction of the Střelenský Tunnel, incl. track No. 1 and 2 on km 22,480–23,610 and track No.1 on km 21,110–27,261 on the line Horní Lideč – state border Slovakia“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/strelensky-tulen.html</link> 
			   <description>The launched construction focuses on the required reconstruction of the Střelenský Tunnel from 1936 as well as on the restoration of track No. 1 on the line Púchov (SR) – Hranice na Moravě (in the section from the state border with Slovakia to km 27,271) and on the repair of train stop Střelná. Several bridges, culverts and retaining walls will be reconstructed. The objective of the construction also includes the new contact line system and the upgrade of the telecommunication and signalling installation, heavy-current technology and the line remote control. The investor of the construction is the Railway Infrastructure Administration, state organization.</description> 
			   <pubDate>Wed, 14 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>SŽDC´s financial performance for the 1st – 3rd Quarter of 2011 and expected financial performance for 2011</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/hospodareni-szdc.html</link> 
			   <description>The Railway Infrastructure Administration, state organization (SŽDC), 
after the assessment of the company performance for the three quarters of 2011 and after
a more accurate estimate for 2011 based on the methodology Forecast, achieved excellent results within the scope of the financial performance.
</description> 
			   <pubDate>Tue, 13 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Launch of the construction „DOZ Česká Třebová - Přerov“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/doz-trebova-prerov.html</link> 
			   <description>The implementation of the construction dealing with the remote traffic control system and running of technological equipment in the track section Přerov (excluding) – Česká Třebová (excluding) including links to the current signalling and information systems has been officially launched. The traffic control centre for this controlled section will be set up in the new building of the Centralized Traffic Control workplace (CTC) in Přerov. The investor of the construction is the Railway Infrastructure Administration, state organization.</description> 
			   <pubDate>Mon, 12 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>SŽDC reorganization: The decrease in the number of the organization units brings about substantial savings and enhances the system performance</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/reorganizace-szdc.html</link> 
			   <description>Prague, 9 December 2011 – the new structure will create conditions for merging functions, which represent the core of rail operation, and for ensuring the operability at the level of SŽDC´s organization units, the merger of the Regional Infrastructure Administrations and the Regional Operating Centres (under SŽDC as at 1.9.2011). This step shall complete the project of „live infrastructure“ at the level of SŽDC´s organization units.</description> 
			   <pubDate>Fri, 09 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive launch of the construction „DOZ Františkovy Lázně - Aš“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/doz-as.html</link> 
			   <description>Another project aiming to enhance the railway safety has been launched on today´s festive occasion; it deals with the implementation of the remote-controlled signalling on the line between Františkovy Lázně and Aš. This construction is significant due to its goal to enhance the safety of railway and road operations – the reconstruction of eight level crossings. The investor of the construction is the Railway Infrastructure Administration, state organization (SŽDC).</description> 
			   <pubDate>Fri, 09 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Launch of the Reconstruction of the Railway Station Stará Paka for signalling long-distance control</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/stara-paka-doz.html</link> 
			   <description>The construction entitled "Reconstruction of the railway station Stará Paka for DOZ" has been launched on today´s festive occasion. The implementation of the construction will result in enhanced safety and reliability of the railway operation including enhanced safety for passengers moving in the track facility and easier access to trains. The investor of the construction is the Railway Infrastructure Administration, state organization.</description> 
			   <pubDate>Tue, 06 December 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line Votice – Benešov u Prahy</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/tunely-votice.html</link> 
			   <description>Two new railway tunnels Olbramovický and Votický were put into operation on a festive occasion – on a modernized section of IV Railway Transit Corridor. Also, the odd set of tracks in the railway station Olbramovice, the new signalling installation in Olbramovice and Votice including the automatic block on the track section Votice – Olbramovice are already operating.</description> 
			   <pubDate>Tue, 29 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Railway station Prague Libeň equipped with the latest signalling installation</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/liben-esa-33.html</link> 
			   <description>A new station interlocking equipment in the railway station Prague Libeň has been put into test operation. It is the electronic interlocking ESA-33 (AŽD Praha) which is to replace the obsolete relay signalling installation AŽD-71 dating from the early 70´s of the past century. The installation of the new modern signalling equipment is part of the construction „Thoroughfare in the railway junction Prague – modernization of the track section Prague Libeň - Prague Běchovice 1st part (including 2nd part)“</description> 
			   <pubDate>Mon, 28 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive Launch of „Thoroughfare through Pilsen Junction in the Direction of III Railway Transit Corridor“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/zahajeni-prujezd-plzen.html</link> 
			   <description>Another important phase of the modernization of the Czech railway was festively launched. The construction „Thoroughfare through Pilsen Junction in the direction of III RTC“ deals with the issues of the western section of the junction from the western gridiron of the passenger station of Pilsen main station to the western gridiron of the current railway station Pilsen South Suburb including the new bridging of the Radbuza River, Prokopova St., Vejprnicky Creek and Vejprnicka St. The construction also includes a double-sided extended subway for passengers in the railway station Pilsen main station. The investor of the construction is the Railway Infrastructure Administration, state organization (SŽDC).</description> 
			   <pubDate>Thu, 24 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Mnichovice after reconstruction one of the prettiest train stops</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/mnichovice.html</link> 
			   <description>The Railway Infrastructure Administration (SŽDC) completed the repair work at the train stop Mnichovice.</description> 
			   <pubDate>Fri, 18 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Signing the Contract for the Thoroughfare in Pilsen</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/podpis-prujezd-plzni.html</link> 
			   <description>A contract for the modernization of the railway junction Pilsen in the direction of III Railway Transit corridor has been officially signed. The construction valued at CZK 942 million (without VAT) will be implemented by the company Skanska during the subsequent two and a half years. The investor is the Railway Infrastructure Administration, state organization. The funds will be provided by the State Fund for Transport Infrastructure and the construction has been proposed to be co-funded by the European Union from the Cohesion Fund.</description> 
			   <pubDate>Mon, 07 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>SŽDC´s Response to Czech Television News Report </title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskova-prohlaseni/reakce-na-reportaz-ct.html</link> 
			   <description>The Railway Infrastructure Administration (SŽDC) issues a press release concerning inaccurate information presented in the news report by Luboš Rosí from the Czech Television.</description> 
			   <pubDate>Mon, 07 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line Votice – Benešov u Prahy:  Work progress (November 2011)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-voben-11-11.html</link> 
			   <description>Given the climatic conditions, it is possible to fully develop the planned working processes; modernization work on the line Votice – Benešov u Prahy is underway, in particular during the ongoing possession of the odd set of tracks of the railway station Olbramovice, including the connection of the local line from Sedlčany.</description> 
			   <pubDate>Tue, 01 November 2011 00:00:00 CET</pubDate> 
		  </item>
	 			   <item>
			   <title>ETCS pilot project in the Czech Republic completed</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/pilotni-projekt-etcs.html</link> 
			   <description>Prague/Kolín, 26th October 2011 – In the track section Poříčany – Kolín the pilot project of the European Train Control System (ETCS) has been implemented. The main objective of the pilot project has been the implementation of ETCS in the conditions of the Czech railway. The pilot project has been co-funded by the European Union from the Cohesion Fund.</description> 
			   <pubDate>Wed, 26 October 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line Votice – Benešov u Prahy: Work progress (October 2011)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-voben-10-11.html</link> 
			   <description>Given the climatic conditions, planned working processes can be fully developed.</description> 
			   <pubDate>Wed, 05 October 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>The European Commission approved co-funding of another big investment project of the Czech railway.</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/uspech-szdc-eu-ek.html</link> 
			   <description>The seventh big investment project (over Euro 50 million) has been endorsed by the European Commission. Approved co-funding of the project "Electrification of the line Zábřeh - Šumperk" by the European Union is a clear confirmation of the professional management dealing with investment projects on the Czech railway for the investor – Railway Infrastructure Administration, state organization.</description> 
			   <pubDate>Fri, 23 September 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive Launch of the „Optimization of the Line Lysá nad Labem - Prague-Vysočany, 1st Construction“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/lysvys-zahajeni.html</link> 
			   <description>Another significant phase of the modernization of the Czech railway was festively launched. The investor of the „Optimization of the line Lysá nad Labem – Prague - Vysočany, 1st construction“ is the Railway Infrastructure Administration, state organization (SŽDC). The first part included the reconstruction of the safety and signalling equipment in the track section Čelákovice - Prague Vysočany.</description> 
			   <pubDate>Tue, 20 September 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line Votice – Benešov u Prahy: Work progress (September 2011)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-voben-09-11.html</link> 
			   <description>Prague, 11 September 2011 – Modernization of the line Votice – Benešov u Prahy: Work progress (September 2011). Given the climatic conditions, it is possible to fully develop the planned working processes; modernization work on the line Votice – Benešov u Prahy is underway, in particular during the ongoing possession of the odd set of tracks of the railway station Olbramovice.</description> 
			   <pubDate>Sat, 10 September 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Live Infrastructure at the Railway Infrastructure Administration (SŽDC) </title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/zidc.html</link> 
			   <description>Prague, 31 August 2011 – Contracts confirming the transfer of 9,480 employees from Czech Railways to the Railway Infrastructure Administration, state organization (SŽDC) were signed today at the Ministry of Transport of the Czech Republic. This act was the final step in transferring the so-called  ”live infrastructure”. It is a continuation of the Czech railway transformation process which has started in 2002 already.
</description> 
			   <pubDate>Thu, 01 September 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>The Railway Infrastructure Administration introduces high-temperature-related speed restriction</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/teplotni-pomale-jizdy.html</link> 
			   <description>Given the current weather conditions – as the temperatures on the rail exceed 40 °C all over the Czech Republic – in order to ensure the safety of railway transport it is necessary to pass the tracks at a reduced speed according to local conditions.</description> 
			   <pubDate>Fri, 26 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line České Budějovice – Nemanice I. Work progress (1st half-year of 2011)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-budnem-1-11.html</link> 
			   <description>Festive launch of the construction took place on 28 April 2011. The investor of the construction is the Railway Infrastructure Administration, state organization.</description> 
			   <pubDate>Tue, 23 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Construction of the transfer terminal Nové Údolí</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/nove-udoli.html</link> 
			   <description>The construction – though small of its extent, it is of great importance – has been co-funded by the European Union under the Programme of Cross-Border Cooperation Objective 3 – the Czech Republic – Bavaria 2007 – 2013, lasted less than 3 months and has been festively completed today.</description> 
			   <pubDate>Thu, 18 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Work on the construction „Reconstruction of the railway station Přerov, 1st construction“ in progress</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-prerov-08-11.html</link> 
			   <description>The reconstruction of the Mádrův underpass continued with II dilatation complex above which there are tracks No. 106X, 2X and 1X.</description> 
			   <pubDate>Wed, 17 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Work on the construction „State border with Slovakia – Bystřice nad Olší“ in progress</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-srb-08-11.html</link> 
			   <description>The new project documentation on the completion of the tunnel reconstruction was approved for the track section state border with Slovakia – Mosty u Jablunkova. In March and April, tunnel grouting was effected and the tunnelling is in progress now.</description> 
			   <pubDate>Tue, 16 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>SZDC´s information on the project „Gateway through the railway junction Pilsen“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/prujezd-uzlem-plzen.html</link> 
			   <description>The Railway Infrastructure Administration is most likely to save up to CZK 600 million during the construction of the „Gateway through the railway junction Pilsen“. This fact is indicated by interim results of the public tender for a contractor of this railway construction, which is one of the biggest, and the implementation will start soon.</description> 
			   <pubDate>Fri, 12 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the line Votice – Benešov u Prahy: Work progress (August 2011)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-voben-08-11.html</link> 
			   <description>Thanks to fair weather conditions, it is possible to proceed to planned work operations; the modernization of the line Votice – Benešov u Prahy is underway, in particular due to ongoing possession of the odd set of tracks of the railway station Olbramovice.</description> 
			   <pubDate>Wed, 10 August 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>The Railway Infrastructure Administration is repairing the line which has been damaged due to the derailment of a train set with historical vehicles</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/historicky-vlak-u-jihlavy.html</link> 
			   <description>UPDATE - the accident which occurred on 29.07.2011 near Jihlava induced by the derailment of a historical carriage and a steam locomotive caused immense damage to the track section Jihlava – Okříšky to such an extent that it had to be closed. The derailment induced considerable damage to the line and regular trains had to be replaced with alternate bus transport. A part of the track section has already been repaired; however, some tracks in the worst damaged sections still have to be attended to.</description> 
			   <pubDate>Sat, 30 July 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Work progress of the construction „Optimization of the line Bystřice nad Olší – Český Těšín“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-byct-07-11.html</link> 
			   <description>The construction proceeds on the reconstruction of the railway station Třinec and of the track section between this station and the railway station Bystřice nad Olší.</description> 
			   <pubDate>Mon, 25 July 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>LATEST NEWS: Work progress of the project „Optimization of the line Zbiroh – Rokycany“</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-zbirok-07-11.html</link> 
			   <description>Along the whole section of the construction, i.e. from the beginning in Zbiroh to the end in the railway station of Rokycany, work currently proceeds in practically all construction- and rail-related professions. They involve new parts of the telecommunication and signalling system, the installation of the contact line system, track replacement including earthwork, reconstruction of bridges and culverts, building platforms, drainage systems and the adopted implementation of noise protection measures.</description> 
			   <pubDate>Wed, 20 July 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Optimization of the line Beroun - Zbiroh, work progress (July 2001)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-bezbi-07-11.html</link> 
			   <description>This month, main work is carried out on track No. 1 between the railway stations of Hořovice – Zbiroh which has been excluded from the railway transport.</description> 
			   <pubDate>Mon, 11 July 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Modernization of the railway section Votice – Benešov u Prahy: Work progress (June 2011)</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/postup-praci-voben-06-11.html</link> 
			   <description>Coming soon...</description> 
			   <pubDate>Mon, 04 July 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Results of a special inspection of lines and safety at level crossings</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-konference/vysledky-prejezdy.html</link> 
			   <description>Invitation, presentation, video, a table listing defects and deadlines</description> 
			   <pubDate>Wed, 29 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>„The Optimization of the line Planá u M. L. (excluding)  - Cheb (excluding)“ receives an award 2010 CZECH TRANSPORT CONSTRUCTION</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/plana-cheb-stavba-roku.html</link> 
			   <description>The investor of the construction „Optimization of the line Planá u Mariánských Lázní – Cheb“, which is part of the complex of 9 independent constructions of the western section of III Railway Transit Corridor, is the Railway Infrastructure Administration, state organization - Civil Engineering Administration Pilsen. </description> 
			   <pubDate>Thu, 23 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Special conference on the issues of track maintenance</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-konference/udrzba-trati.html</link> 
			   <description>Invitation, presentation,  drawing</description> 
			   <pubDate>Mon, 20 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Getting stuck at a level crossing does not have to lead to an accident; you just have to follow basic rules.</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/srazka-autobusu.html</link> 
			   <description>Today´s collision between the bus and the express train in Chrást u Plzně could highly unlikely be prevented. However, drivers often do not know how to react in similar situations.</description> 
			   <pubDate>Sat, 18 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Modern signalling installation secured the stop of trains in case of human error</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/skutec-vyjeti-vlaku.html</link> 
			   <description>The signalling installation on the line Svitavy – Ždárec u Skutče registered an unpermitted passenger train and secured the stop of another train coming from the opposite direction.</description> 
			   <pubDate>Sat, 18 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>SŽDC ensures the restoration of safe rail operation as soon as possible</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/znovuzprovozneni-trati.html</link> 
			   <description>The Railway Infrastructure Administration, state organization, as the operator of the state-owned railway network is going to check all important lines prior to the strike termination. On all national lines (corridor as well as non-corridor), inspection runs will be carried out, in order to ensure safe launch of the operation, three hours prior to the planned strike termination until the first train departs. </description> 
			   <pubDate>Thu, 16 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive completion of: RECONSTRUCTION OF THE RAILWAY STATION NESOVICE, II PART </title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/nesovice-ukonceni.html</link> 
			   <description>An important reconstruction of the track facility had been under way in the railway station Nesovice for less than a year. The construction completed on today´s festive occasion has been co-funded by the European Union under the Operational Programme Transport. The total cost of the station reconstruction is CZK 166,935.207 without VAT. The Cohesion Fund is to contribute with the amount of CZK 139,513.842, which accounts for 85 % of the eligible cost of the project. The remaining part has been co-funded from national resources through the State Fund for Transport Infrastructure.</description> 
			   <pubDate>Wed, 15 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Press statement on the situation on the line Vyškov - Ivanovice na Hané</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskova-prohlaseni/mu-vyskovivanovice.html</link> 
			   <description>In connection with the accident which occurred in the track section Vyškov – Ivanovice na Hané on 5. 6. 2011, Ing. Pavel Habarta, SŽDC´s Executive Director, issues the following order:</description> 
			   <pubDate>Fri, 10 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>ILCAD 2011 in Czech republic</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/ilcad-2011.html</link> 
			   <description>The investments in level crossing safety installations will increase by more than 30% in 2012 compared to 2011 and the cost will total more than CZK one billion. Almost 500 million will then be spent on repair and maintenance of level crossings. </description> 
			   <pubDate>Thu, 09 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Railway Infrastructure Administration, state organization, 6 months after the changes in the management structure</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-konference/ph-6-mesicu-ve-vedeni.html</link> 
			   <description>Invitation, presentation</description> 
			   <pubDate>Sat, 04 June 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Festive completion of the Optimization of the railway section Planá u Mariánských lázní - Cheb</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/plana-cheb-slavnost.html</link> 
			   <description>The „Optimization of the railway section Planá u Mariánských Lázní – Cheb was festively completed. The completion of the whole western branch of III Railway Transit Corridor resulted in 30-minute shorter journey time between Cheb and Plzeň. Another benefit of the construction is the enhancement of rail operation safety by means of up-to-date signalling installation, and higher comfort for the public in the form of barrier-free accesses or information systems.  Overall, the construction provided higher technical parameters in line with the requirements for the trans-European railway network (TEN-T). The essential strong point is the compliance with European safe passage capability of the line class D4 UIC and loading gauge UIC – GC.</description> 
			   <pubDate>Fri, 20 May 2011 00:00:00 CEST</pubDate> 
		  </item>
	 			   <item>
			   <title>Night at the museum on the exhibition of the telecommunication and signalling equipment in Hradec Kralove</title> 
			   <link>http://www.szdc.cz/en/pro-media/tiskove-zpravy/muzejni-noc.html</link> 
			   <description>On the occasion of the International day of Museums and Galleries, IV Year of the Night at the Museum in Hradec Kralove is held on Friday, 20th May 2011 from 6 p.m. to 12 a.m. The entry to all museums and galleries is free on this night. The same applies to the exhibition of telecommunication and signalling equipment.</description> 
			   <pubDate>Wed, 11 May 2011 00:00:00 CEST</pubDate> 
		  </item>
	  </channel>
</rss>
 
