Current news

25.01.2012 Reconstruction of the Railway Junction Břeclav coming to an end

Despite the restrictions on funds for the reconstruction of the transport infrastructure of the Czech Republic, the Railway Infrastructure Administration, state organization manages to prepare new projects for the implementation of important constructions thanks to reduced expenses. This fact is supported by the completed project for the „Reconstruction of the railway junction Břeclav, 2nd construction“. The railway station Břeclav is one of the most important railway junctions of international significance connecting the Czech Republic with Austria and Slovakia.

12.01.2012 Festive Completion of the Optimization of the Line Stříbro – Planá u Mariánských Lázní

The completed construction mainly contributes to enhanced line speed of up to 140 km/h from the original 60-90 km/h and to enhanced rail operation safety. The optimization focused on a 32km-long single-track section, including seven railway stations (Stříbro, Milíkov, Svojšín, Ošelín, Pavlovice, Brod nad Tichou and Planá u Mariánských Lázní). The section is part of III Railway Transit Corridor. The construction is situated in a most complex and inaccessible territory. The investor of the construction is the Railway Infrastructure Administration, state organization and a significant share - ca 73 % is co-funded by the European Union from the Cohesion Fund.

09.01.2012 The Railway Infrastructure Administration as a partner of an important photography competition promoting the safety at level crossings

The foundation BESIP with the support of the Ministry of the Interior, the Ministry of Transport, the Ministry of Education, Youth and Sports as well as in cooperation with the Railway Infrastructure Administration, state organization, announces a photography competition promoting the traffic operations safety and the safety at level crossings.

04.01.2012 Modernization of the line Votice – Benešov u Prahy: Work progress (January 2012)

In the past period, work focused on the dismantling of the abandoned line between Votice and Olbramovice and on a reconstructed even set of tracks in Olbramovice, including the dismantling of the current bridge structures – the abandoned railway bridge over Road I/18 and the completely rebuilt extended railway bridge over Road III/11447 from Olbramovice to Božkovice.

04.01.2012 2011: The lowest number of accidents at level crossings since 2004!

In connection with the released statistics of the Rail Safety Inspection of the Czech Republic concerning the number of accidents at level crossings, the Railway Infrastructure Administration – state organization – as the operator of the state-owned rail also presents a press release with complementary data on the level crossings for the respective period.

04.01.2012 Dokumenty

Reception (Prague)
Phone:+420 222 335 711
(ONLY Mo–Fr 7:00–15:00)

  Mail us
More contacts

epodatelna@szdc.cz Copyrigtht © 2009 SŽDC, s.o.